A balanced workload: say goodbye to production delays

By Pascal Pollet – Sirris, Belgium

In complex manufacturing environments, variability is often the biggest challenge. Fluctuating demand, diverse routings, and uncertain processing times lead to long and unpredictable lead times, frequent rescheduling, and constant firefighting.

Workload Control (WLC) offers a practical solution to these issues. It is a planning concept specifically designed for high-variability, make-to-order, and job shop environments — the types of environments where traditional planning systems tend to fail.

What is workload control (WLC)?

WLC regulates the release of orders to the shop floor based on the current workload of key work centers. It answers a simple but crucial question that most ERP or MRP systems overlook: “Is the shop floor ready for more work?”

Instead of pushing all orders into production, WLC controls the flow of work, keeping it aligned with available capacity. The result: smoother operations, shorter production lead times, and less stress for planners and operators alike.

How does it work?

WLC is built on three core mechanisms:

  1. Order pooling: sometimes waiting is a good idea
    Customer orders are first processed in the office but are not immediately released.
    Instead, they are held in an order pool — a kind of “waiting room” for production ready orders that are not yet allowed into production. This prevents the shop floor from being flooded with too much work at once.
  2. Workload monitoring: knowing what’s happening where
    At regular intervals (for example, daily), the workload of each work center is calculated. The workload is measured in time units and includes the released work already present at the work center and the released work still on its way to the work center.

    The first work center in a routing sequence will immediately experience the additional workload after a release, whereas a work center later in the routing will only notice this extra load after some time. Workload Control (WLC) uses a weighting factor to correct for this effect.

    A simple example illustrates how this works. Orders that are on their way to, for instance, the third work center in a routing may at any given time be located at the first, second, or third work center. This means that, roughly speaking, there is only a one-in-three chance that the order is actually waiting at the third workstation. Therefore, it makes sense to weight the order’s contribution to the workload of the third workstation by a factor of one-third.

    In Workload Control, each workstation is assigned a predefined workload norm that limits the maximum allowable workload. This norm is often based on the average capacity of the workstation over a given time horizon (e.g., three days).

  3. Controlled order release: giving the green light at the right moment
    The orders in the order pool are ranked by priority (e.g. earliest start date). The planner then checks when each order can be released. An order is released only if all the work centers it will visit are still below their workload norm. Once released, workloads are updated — and the process continues for the next order.

    This keeps released work in balance with available capacity, avoiding both idle time and overload.

What are the benefits?

Companies that adopt WLC can expect improvements in both operational performance and planning stability:

  • Shorter and more stable lead times on the shop floor
    Regulating the inflow makes the waiting time at machinery shorter and more predictable. Less WIP = faster flow.
  • Higher delivery reliability
    Simulation reseach has shown WLC can halve the number of late deliveries. Better planning means satisfied customers – and less rescheduling stress.
  • Lower inventory costs
    Reduced WIP leads to less handling, lower inventory, and better visibility.
  • Less firefighting
    Because work centers are less idle or overloaded, the need for manual interventions and firefighting is reduced. Planners regain breathing space — and so do the operators.

When to use Workload Control?

Workload control excels in settings where variability is a recurring feature. For example:

  • Make-to-order and engineering-to-order
  • Job shops with various product types and complex routing
  • Unstable environments with capacity fluctuations or unpredictable disruption

Traditional scheduling assumes stability; WLC thrives on variability by managing flow instead of relying on fixed, detailed schedules.

Getting started with WLC

Implementing WLC doesn’t have to be complicated. Here are some practical tips:

  • Set realistic workload norms: Start with higher limits and lower them gradually as experience grows.
  • Use existing IT tools: Many ERP or MES systems already contain the needed data. Start simple, even with Excel, and monitor workloads daily.
  • Engage people: Planners must trust the release logic, and operators should see the benefits of a steady, realistic workload.

Final thoughts

Workload Control offers a simple yet powerful way to stabilize production, reduce lead times, and create a calmer, more predictable work environment. In essence, it transforms planning from pushing orders through the system into pulling work based on real capacity — a principle perfectly aligned with Quick Response Manufacturing (QRM).